Other Projects
Name of Project | Year | Country | Contract Value (US$) | Short Introduction |
---|---|---|---|---|
Delhi Metro CC04 | 2015 | India | 75 Million | Design and Construction of 2.5km long twin tunnels by EPB TBM's with Underground Station at Azadpur by Cut & Cover method & Ramps at Mukundpur and Shalimar Bagh for underground works on Mukundpur. Yamuna Vihar Corridor |
Jaipur Metro UG-1B | 2014 | India | 157 Million | The phase 1B of Jaipur Metro rail project is covering a length of 2.4 km using two EPB TBM´'s from Chandpole to Badi Chaupar with two underground stations at Chhoti Chaupar and at Badi Chaupar. |
DMRC Airport Line | 2014 | India | 500 Million | The Delhi Airport Line is the Metro line linking New Delhi Metro Station to Indira Gandhi International Airport. The total length of the line is 22.7km, of which 15.7km is underground and 7km is elevated. |
Shatin to Central Link C1122 MTRC | 2015 | Hong Kong | 350 Million | Overrun tunnel for Admiralty station as part of the Shatin to Central Metro Link. |
MTR 901 Admiralty Station | 2011 | Hong Kong | 260 Million | Complex underground station to join new MTR line into existing two-line station complex in the center of HK. |
West Island Line C703& C705 MTRC | 2009 | Hong Kong | 250 Million | Tunneling works for West Island Line including complicated freezing section. |
LTA MRT Circle Line Contracts C852 & C855, Singapore | 2003 | Singapore | 157 Million | Construction started in March 2002 and involved 3800 m of bored tunnel, which was excavated using 6.35 m diameter EPB tunnel boring machines. |
High Speed Rail Link Wuerzburg-Hannover | 1985 | Germany | 500 Million | Tunnel Construction for High-Speed Rail Link between the cities of Wuerzburg and Hannover. |
Athens Metro Line 2 & 3 | 1992 | Greece | 1500 Million | Construction of 2 new metro lines in the city of Athens incl. 14 stations and 17km of new underground metro. |
Lai Chi Kok Drainage Scheme | 2012 | Hongkong | 200 Million | The 3.7 kilometres long Lai Chi Kok Drainage Tunnel comprises a 2.5 kilometres mid-hill branch tunnel that runs from Tai Wo Ping to Butterfly Valley, Connecting the two tunnels is a stilling basin. |
MTRC Contract 904, South Island Line | 2013 | Hongkong | 250 Million | This contract involved tunnels and two new stations located on Ap Lei Chau. The works measured approximately 1.2 km and it was constructed by a combination of drill and blast, mechanical excavation, and cut and cover tunnelling techniques. |
MTRC Contract 1112 | 2015 | Hongkong | 300 Million | This new underground station and stabling sidings is a complex project directly underneath the existing Hung Hom Main Train Station and forms an integral part of the Shatin Central Line (SCL). |