Name of Project Year Country Contract Value (US$) Short Introduction
Delhi Metro CC04 2015 India 75 Million

Design and Construction of 2.5km long twin tunnels by EPB TBM's with Underground Station at Azadpur by Cut & Cover method & Ramps at Mukundpur and Shalimar Bagh for underground works on Mukundpur. Yamuna Vihar Corridor

Jaipur Metro UG-1B 2014 India 157 Million

The phase 1B of Jaipur Metro rail project is covering a length of 2.4 km using two EPB TBM´'s from Chandpole to Badi Chaupar with two underground stations at Chhoti Chaupar and at Badi Chaupar.

DMRC Airport Line 2014 India 500 Million

The Delhi Airport Line is the Metro line linking New Delhi Metro Station to Indira Gandhi International Airport. The total length of the line is 22.7km, of which 15.7km is underground and 7km is elevated.

Shatin to Central Link C1122 MTRC 2015 Hong Kong 350 Million

Overrun tunnel for Admiralty station as part of the Shatin to Central Metro Link.

MTR 901 Admiralty Station 2011 Hong Kong 260 Million

Complex underground station to join new MTR line into existing two-line station complex in the center of HK.

West Island Line C703& C705 MTRC 2009 Hong Kong 250 Million

Tunneling works for West Island Line including complicated freezing section.

LTA MRT Circle Line Contracts C852 & C855, Singapore 2003 Singapore 157 Million

Construction started in March 2002 and involved 3800 m of bored tunnel, which was excavated using 6.35 m diameter EPB tunnel boring machines.

High Speed Rail Link Wuerzburg-Hannover 1985 Germany 500 Million

Tunnel Construction for High-Speed Rail Link between the cities of Wuerzburg and Hannover.

Athens Metro Line 2 & 3 1992 Greece 1500 Million

Construction of 2 new metro lines in the city of Athens incl. 14 stations and 17km of new underground metro.

Lai Chi Kok Drainage Scheme 2012 Hongkong 200 Million

The 3.7 kilometres long Lai Chi Kok Drainage Tunnel comprises a 2.5 kilometres mid-hill branch tunnel that runs from Tai Wo Ping to Butterfly Valley, Connecting the two tunnels is a stilling basin.

MTRC Contract 904, South Island Line 2013 Hongkong 250 Million

This contract involved tunnels and two new stations located on Ap Lei Chau. The works measured approximately 1.2 km and it was constructed by a combination of drill and blast, mechanical excavation, and cut and cover tunnelling techniques.

MTRC Contract 1112 2015 Hongkong 300 Million

This new underground station and stabling sidings is a complex project directly underneath the existing Hung Hom Main Train Station and forms an integral part of the Shatin Central Line (SCL).
The scope of work for Contract 1112 includes significant modification works to an existing MTR station, platforms, a tunnel box and approach tunnels.